The Brewery - Timeline


Skip to a section:
Page 1 (6/05 - 5/06) | Page 2 (6/06 - 8/06) | Page 3 (9/06) | Page 4 (10/06 - 12/06)


June 30, 2005
Skyscraper Brewing Company incorporates in California.

October 1, 2005
The brewery finds a home in El Monte.
(Brewery exterior)

January 18, 2006
The brewhouse arrives! 15bbl copper clad mash tun, hot liquor tank, and direct-fired kettle.
(Brewhouse)
It has been out in the elements for a while, so it needs a bit of cleaning up.
Click here for more pictures!

January 25, 2006
Picked up the filter - a Velo 3 square meter DE filter in great shape.
(Filter)

January 27 - March 1, 2006
Click here to view the process of cleaning the brewhouse!
Here is a picture of the brewhouse vessels after the exterior cleaning was completed.
(Brewhouse)

March 31, 2006
Took delivery of a forklift to help with the heavy lifting.
(Forklift)
Thomas likes to help drive.
(Thomas on forklift) (Thomas on forklift)

April 12, 2006
Thomas likes to help with the new pallet jack, too.
(Thomas with pallet jack) (Thomas with pallet jack)

April 19, 2006
Received an old open fermenter for use as a Cold Liquor Tank. Its legs had to be amputated to get it out of its old home, which is why it's lying on its side.
(Cold Liquor Tank)

May 22, 2006
Turned in ABC (State of California) paperwork, posted the obligatory sign.
(ABC sign)

May 25, 2006
TTB (U.S. Department of Treasury) paperwork approved.

May 26, 2006
Received laminar flow hood. This will make lab and yeast work much easier and cleaner.
(Laminar flow hood)

Next page -->


Copyright 2006 Skyscraper Brewing Company